Using SCD Stage with Data stored in Netezza
Posted: Mon Oct 01, 2007 6:56 am
Hi,
My project is in the design stage and I would like to know if anyone used SCD Stage with Netezza DB as Source / Target.
Both the SCD and Netezza stages are new to me (even though we had Netezza Plug-in in DS 7.5 we never connected ) and I understand Netezza stage is only a bulk load stage. Can Netezza connection be used as a Source and target in a SCD stage ?
Thanks a lot for any information on this.
Regards,
Aruna.
My project is in the design stage and I would like to know if anyone used SCD Stage with Netezza DB as Source / Target.
Both the SCD and Netezza stages are new to me (even though we had Netezza Plug-in in DS 7.5 we never connected ) and I understand Netezza stage is only a bulk load stage. Can Netezza connection be used as a Source and target in a SCD stage ?
Thanks a lot for any information on this.
Regards,
Aruna.