I would like to run some jobs at the same time.
Please how to run?
How to run jobs Parallely in Batch Jobs
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 612
- Joined: Thu May 03, 2007 4:59 am
- Location: Melbourne
In Director you have the option to generate batch script for DS
Joshy George
<a href="http://www.linkedin.com/in/joshygeorge1" ><img src="http://www.linkedin.com/img/webpromo/bt ... _80x15.gif" width="80" height="15" border="0"></a>
<a href="http://www.linkedin.com/in/joshygeorge1" ><img src="http://www.linkedin.com/img/webpromo/bt ... _80x15.gif" width="80" height="15" border="0"></a>
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
The preferred mechanism these days is to create a job sequence.
Run jobs simultaneously in a job sequence by not having any dependency from one Job activity to another.
Run jobs simultaneously in a job sequence by not having any dependency from one Job activity to another.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.