DS 7.5 has new capability to run sequencer from the Middle

Posted: Wed Apr 04, 2007 12:54 am
by pras
Hi All,

We have upgraded our DS from DS7 to DS 7.5.2.

In DS 7 earlier, If a sequencer is aborted in the middle , We used to trrigger the remaining jobs manually or restart the whole sequencer.

i want to know that wether "DS 7.5 has the new capability to run the sequencer from the middle". If yes please let me know how to proceed with that.

Thanks in advance.

Cheers,
Pras

Posted: Wed Apr 04, 2007 1:29 am
by rameshrr3
Yes It Does, search the forum for "checkpoint".
If you want the sequencer to run from the start , you will have to reset it , or else it will run from the first point of failure it encountered.

In the sequencer properties you will find the following option " Add checkponts so that sequencer is restartable on failure", you will need to set this property. In each of the individual jobs or routines that your sequencer calls, you have an option 'to set' or 'not to set' checkpoints.

HTH

Posted: Wed Apr 04, 2007 3:24 am
by pras
Thanks a lot HTH.

is it possiblt to Set the checkpoints in Server job?? Please advice me for the same.

Thanks in advance.

Cheers,
Pras

Posted: Wed Apr 04, 2007 7:03 am
by chulett
HTH means 'Hope That Helps'. :wink:

You need to design 'checkpoints' or restartability into your jobs, there's no magic switch.

Posted: Wed Apr 04, 2007 7:04 am
by chulett
:!: You've posted this question twice. Please delete the duplicate post before someone replies to it.