Hi,
When any before/after job subroutine fails, there is only a warning in the director. Is there any settings that can be made to abort the job when a subroutine fails?
Aravind.
Subroutines
Moderators: chulett, rschirm, roy
Re: Subroutines
If you have before job subroutine then the job runs only if before job subroutine returns a 0 value. You job does not run if before job subroutine fails.swamiar wrote:Hi,
When any before/after job subroutine fails, there is only a warning in the director. Is there any settings that can be made to abort the job when a subroutine fails?
Aravind.
If After job subroutine fails then warning is logged to director log. Set your warning limit to 1 to abort the job.