Hi,
For the past few weeks we have been having many of our parallel jobs just hanging on the OSH script (...) step in Director. There is no affect o the server jobs all run normally, but our parallel jobs randomly get hung up. Sometime s it is when we kick off a simple job minutes after midnight that only extracts a single row from the DB and writes out to a sequential file and sometimes it is when we are kicking off many jobs simultaneously. In either case the server seems not to be overloaded and I am not sure what I can be looking at to help resolve this. I have opened a PMR with IBM and they have assigned it to the engineering group. I was just wondering if anyone has experienced this before.
Thanks - - John
Parallel jobs hanging on OSH script (...) step
Moderators: chulett, rschirm, roy
-
- Premium Member
- Posts: 306
- Joined: Wed Jun 21, 2006 11:41 am
-
- Participant
- Posts: 41
- Joined: Sat Jun 06, 2009 11:13 pm
- Location: Kolkata