Take us higher up...what is your ultimate goal here? Having 50 different output (for different nodes, etc.) is entirely do-able within the Stage...but the links have to be defined and in your Job.....the Stage will take care of sending the output to the appropriate link depending on the incoming content.
Hope, we are not on the same page here. let me brief again.
Actually we have dynamically changing Input over that we have create respective XML files.
I have source files like CSV1,CSV2, CSV3...CSV50 and these should be converted to XML1,XML2,XML3.....XML50. All the Input is not part of a single node of single file but each details will part indepedent source files.
What we wanted here is 1:1 mapping should be built between CSV:XML.
And our query over this, Is this achievable in a single Datastage Job or we need 50 DS jobs specific to each files as each file has got it's own metadata defined in it.