I have a question. is it possible for datastage sequence to run a job from certain checkpoint and trigger all the undone job?
My objective is : when any of my job at the sequence get abborted, I want my sequence only restart from certain aborted job activities and trigger all activities which depend on it.
I have followed all the previous post about the similar topic at this forum. I have checked both the "add checkpoints so sequence is restartable on failure" box and the "Automatically handle activities that fail" box. I also have set all job activity properties to "reset if required then run".
the three things I did above has solved the checkpoint problem. But, the other problem which is raised is: my sequence will abort as soon as it reached the aborted job stage. which cause all job activities which is not depend on the aborted job is also stopped.
![Sad :(](./images/smilies/icon_sad.gif)
So, is it possible for datastage to:
1. when the sequence is restarted,it run from certain aborted point and automatically trigger all jobs which depends on it.
2. but at the other side, I don't want because of a job aborted, another non-dependent job is stopped also.
and if it is possible, how to do it? I have tried to use terminator stage to help,but it still didn't work as what I want.
Thanks in advance. and I really appreciate any help from all of you
Thanks,
Caterin