DataStage Upgradation issue

Post questions here relative to DataStage Enterprise/PX Edition for such areas as Parallel job design, Parallel datasets, BuildOps, Wrappers, etc.

Moderators: chulett, rschirm, roy

Post Reply
Nareshkurra
Participant
Posts: 21
Joined: Mon Aug 04, 2008 8:34 am
Location: Guntur

DataStage Upgradation issue

Post by Nareshkurra »

Hi all,

We have upgraded our Datastage(7.5.1 to 7.5.3) and Oracle(9i to 10g) in our current environment.

The issue here is few of the DS jobs which used to run just for 1 min in our previous environment are now running for long time and they are not even getting completed. We are killing them manually from DS director.

Can any one please let us know why is this happening?
Naresh
Sainath.Srinivasan
Participant
Posts: 3337
Joined: Mon Jan 17, 2005 4:49 am
Location: United Kingdom

Post by Sainath.Srinivasan »

Check the director log and monitor to see what operation is being performed when the system is slow.

Run the operating system admin commands to check process and space.
Nareshkurra
Participant
Posts: 21
Joined: Mon Aug 04, 2008 8:34 am
Location: Guntur

Post by Nareshkurra »

Hi,

I have verified the space on my OS, everything looks fine.
Naresh
vinnz
Participant
Posts: 92
Joined: Tue Feb 17, 2004 9:23 pm

Post by vinnz »

Is the problem only with jobs loading to Oracle? Do DataStage and Oracle reside on the same box? Do you see the same issue with jobs that do not connect to the database?
Post Reply