I have sequencer1 that calls 3 jobs and a routine, the jobs design
sequencer 1 comprises of teh below:
Job1 -> routine -> Job2 -> Job3
The sequercer1 is called by a Master Sequencer,
Sequencer1 runs fine as a stand alone but when I try to call it it within the Master Sequencer the first job works fine and then i get the below error message
(fatal error from @Count_Abort): Sequence abort requested
What other error message are logged in any of the jobs? Post them complete and unedited, please. Also, what does the routine do and does it always return a '0'? A non-zero return is considered a failure in some cases.
-craig
"You can never have too many knives" -- Logan Nine Fingers