Hi,
I have a sequencer job which has a nested condition stage and couple of parallel jobs. During Run time based on an input parameter value and the condition defined in the nested condition stage, the sequencer job with run only certain parallel jobs. There are two flows coming out of nested condition stage and at a given run only one flow will be executed. I want to be able to find what are all the parallel jobs within the sequencer that were run during the last run.
dssearch -ljobs -uses <project_name> <sequencer_name> provides me the list of all parallel jobs within the sequencer but my requirement is to find only the parallel jobs that were run during the last run of the sequencer.
List the Parallel Jobs in a sequencer
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 14
- Joined: Wed Dec 26, 2007 10:56 am
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
Look at the log for the sequence itself. Right near the end is an event called "summary of sequence run". This event alone will provide the information you seek.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.