SCD stage output
Moderators: chulett, rschirm, roy
SCD stage output
Hi All,
I attended DX444(IBM Trainer) training last week as per our project requirement.
Though new SCD stage feature was not part of the training,it was given in the courseware and I implemented the SCD type 2 using this stage in this training and found following which is really strange to me as well as to trainer:
1)I have used SCD stage to implement a SCD type 2 Product dimension and mentain all the steps mentioned in the LAB exercise.
2)What I found in the Dimension table that,the output is simply resembling TYPE 1 change that is if any attribute of an existing records get changed,the new value only updated in the table ,old records ie the records with CURR Indicator='N' is lost.
I am not sure whether it requires any patch to be installed(trainer was also not sure) but it really seems strange..
Any one could throw light upon this ?
regards,
Rumu
I attended DX444(IBM Trainer) training last week as per our project requirement.
Though new SCD stage feature was not part of the training,it was given in the courseware and I implemented the SCD type 2 using this stage in this training and found following which is really strange to me as well as to trainer:
1)I have used SCD stage to implement a SCD type 2 Product dimension and mentain all the steps mentioned in the LAB exercise.
2)What I found in the Dimension table that,the output is simply resembling TYPE 1 change that is if any attribute of an existing records get changed,the new value only updated in the table ,old records ie the records with CURR Indicator='N' is lost.
I am not sure whether it requires any patch to be installed(trainer was also not sure) but it really seems strange..
Any one could throw light upon this ?
regards,
Rumu
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
Ideally she should resolve this but she keeps on telling that SCD stage is out of scope for training DX444 hence she is unable to say anything......ray.wurlod wrote:I can't really check this until next time I teach DX444, which is unlikely to be before November. Your trainer should, however, be able to solve this. ...
The patch FP1a is applied also.
Regards,
Rumu
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
That's a good trick. There's no such certification for DataStage mentioned on the IBM web site - currently the only version 8 certification mentioned there is Information Analyzer.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.