7.5.1 A to Hawk(8.0.0.1) DataStage Migration

Post questions here relative to DataStage Enterprise/PX Edition for such areas as Parallel job design, Parallel datasets, BuildOps, Wrappers, etc.

Moderators: chulett, rschirm, roy

Post Reply
Jasti
Participant
Posts: 44
Joined: Sat Apr 14, 2007 6:34 am
Location: Hyderabad, India

7.5.1 A to Hawk(8.0.0.1) DataStage Migration

Post by Jasti »

Hi,
When we tried to run the Job Sequences developed on v 7.5.1 A in version 8.0.0.1 the Job Sequences were aborted.

The error messages are:
1)
main_program: APT_PMConnectionRecord::rsh: fork failed, Resource temporarily unavailable
main_program: APT_PM_LocalShell: fork failed, errno = 11
main_program: APT_PMConnectionRecord::rsh: fork failed, Resource temporarily unavailable
APT_PMConnectionRecord::rsh: fork failed, Resource temporarily unavailable

main_program: The section leader on etlqa1 died
main_program: **** Parallel startup failed ****
This is usually due to a configuration error, such as
not having the Orchestrate install directory properly
mounted on all nodes, rsh permissions not correctly
set (via /etc/hosts.equiv or .rhosts), or running from
a directory that is not mounted on all nodes. Look for
error messages in the preceding output.

2) main_program: Error parsing modify adapter: Error in binding: Expected destination field selector, got: ";"; input:

Please suggest me on these..

Thanks,
Jasti.
ArndW
Participant
Posts: 16318
Joined: Tue Nov 16, 2004 9:08 am
Location: Germany
Contact:

Post by ArndW »

If you have checked the APT_CONFIG file syntax and it is correct, then most likely your DS Server isn't sufficiently powerful or not configured with enough memory to deal with all the PX processes. Try a smaller APT_CONFIG file configuration and see if that fixed the problem.
Post Reply