Sequencer job actvy parameters missing after successful run

Post questions here relative to DataStage Enterprise/PX Edition for such areas as Parallel job design, Parallel datasets, BuildOps, Wrappers, etc.

Moderators: chulett, rschirm, roy

Post Reply
verify
Premium Member
Premium Member
Posts: 99
Joined: Sun Mar 30, 2008 8:35 am

Sequencer job actvy parameters missing after successful run

Post by verify »

Hi,

We are facing a peculiar problem with sequencers. The issue is that for some job activities the parameters go missing even after a successful run of the sequencer. The sequencer goes into Uncompiled state. Is this a bug in 8.0.



Thanks,
Prasanna
RK Raju
ArndW
Participant
Posts: 16318
Joined: Tue Nov 16, 2004 9:08 am
Location: Germany
Contact:

Post by ArndW »

We have encountered issues with Parameter Sets at V8 to which we received a client-side patch; but we never saw the "uncompiled" state problem.
verify
Premium Member
Premium Member
Posts: 99
Joined: Sun Mar 30, 2008 8:35 am

Post by verify »

ArndW wrote:We have encountered issues with Parameter Sets at V8 to which we received a client-side patch; but we never saw the "uncompiled" state problem.
Hi ArndW,

Thanks for the response.We are actually using a list of parameters and not a parameter set. Can you please elaborate the issue faced.Please let me know if the patch is applicable to parameters too.

Thanks
RK Raju
ArndW
Participant
Posts: 16318
Joined: Tue Nov 16, 2004 9:08 am
Location: Germany
Contact:

Post by ArndW »

The patch we needed was only applicable to V8 Parameter Sets and does not apply to normal parameters.