Job shows PID Failed.
However was running very fine until a week before when we last ran it.
Tried all of the following, nothing works:
1. Cleared &PH& Directory
2. Unlock user on TCL. (This clears locks indeed but locks are created again on job run)
3.Deleted and redeployed job from version control
4. Ran ds.reindex
5 Ran DS.Checker
6. Stopped and Restarted DataStage Server.
Important to note is that the job runs perfect by itself but shows this error when called from a sequence.
Also shows this log message:
From previous run
DataStage Job 1085 Phantom 14706
Program "DSD.RUN": Line 2166, Variable previously undefined. Zero length string used.
Program "DSD.RUN": Line 2166, Variable previously undefined. Zero length string used.
Program "DSD.RUN": Line 2166, Variable previously undefined. Zero length string used.
Program "DSD.RUN": Line 2166, Variable previously undefined. Zero length string used.
Program "DSD.RUN": Line 2166, Variable previously undefined. Zero length string used.
Program "DSD.RUN": Line 2166, Variable previously undefined. Zero length string used.
Program "DSD.RUN": Line 2166, Variable previously undefined. Zero length string used.
Help Appreciated.
PID Failed
Moderators: chulett, rschirm, roy
Is it called with exactly the same parameters from the sequence? Is it a multi-instance job and is it called up with an instance name?
<a href=http://www.worldcommunitygrid.org/team/ ... TZ9H4CGVP1 target="WCGWin">
</a>
</a>
The error message from DSD.RUN looks like it comes from a "reset" of a job sequence, not a Parallel job, ist that right? Or is this the log of the aborted PX job?
<a href=http://www.worldcommunitygrid.org/team/ ... TZ9H4CGVP1 target="WCGWin">
</a>
</a>