HI All
I want to create a parallel subroutine for my datastage job . Can anybody let me know what steps I have to follow for creating a parallel subroutine .
Thanks.
Parallel Subroutines
Moderators: chulett, rschirm, roy
Parallel Subroutines
Regards
Lotus26
Lotus26
Very roughly:
- Code your subroutine in c++, compile and load it into a library
- Create a new parallel subroutine from the manager and add the details on the parameters, name and location of the coded routine
Note from the HELP
- Code your subroutine in c++, compile and load it into a library
- Create a new parallel subroutine from the manager and add the details on the parameters, name and location of the coded routine
Note from the HELP
Example parallel routines are supplied on the Client Installation CD in the directory Samples/TrxExternalFunctions. The readme file explains how to use the examples on each platform.
-
- Participant
- Posts: 612
- Joined: Thu May 03, 2007 4:59 am
- Location: Melbourne
I have a blog post: DataStage Parallel routines made really easy. You might find it helpful.
Joshy George
<a href="http://www.linkedin.com/in/joshygeorge1" ><img src="http://www.linkedin.com/img/webpromo/bt ... _80x15.gif" width="80" height="15" border="0"></a>
<a href="http://www.linkedin.com/in/joshygeorge1" ><img src="http://www.linkedin.com/img/webpromo/bt ... _80x15.gif" width="80" height="15" border="0"></a>