I need to run a parallel sequence which in turn runs few jobs & routines.
The need is to run the job continuously & hence to poll database constantly. The problem arising is due to lack of options available in DStage Scheduler for continuous run, I need to use daily/every option, but this creates the problem that one job is yet not over and the next schedule is triggered for the same database instance and hence it hangs the jobs & goes in some infinite loop. Kindly advise how to get the desired output using DStage 7.5.1 features
Vikas
Job Scheduling
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 3337
- Joined: Mon Jan 17, 2005 4:49 am
- Location: United Kingdom
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
Write a controlling job sequence that includes StartLoop and EndLoop activities. You can schedule this once per day. Include a mechanism (such as existence of a file) for requesting it to shut down.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Or incorporate them into a Routine and leverage that inside the Loop. I've done that, one Sequence job that runs 'all day' and processes a series of Server jobs every 5 minutes inside a loop. It sleeps, looks for an early exit flag, all kinds of things - and wasn't that hard to setup.
-craig
"You can never have too many knives" -- Logan Nine Fingers
"You can never have too many knives" -- Logan Nine Fingers
-
- Participant
- Posts: 15
- Joined: Tue Dec 13, 2005 12:38 am