When I run dsexport or dscmdexport my DSX file gets up to 600+MB and the export still not done after 11+ hrs. It seems like when it gets to exporting binaries things REALLY show down.
Is there anyway to exclude binaries during these export functions? Or is there another problem I don't know about?
thanks!
dsexport / dscmdexport never seem to finish..
Moderators: chulett, rschirm, roy
How many jobs are you backing up?
Last edited by kduke on Thu May 04, 2006 9:39 am, edited 1 time in total.
Mamu Kim
![Shocked :shock:](./images/smilies/icon_eek.gif)
![Shocked :shock:](./images/smilies/icon_eek.gif)
You really should be exporting by category and use multiple concurrent exports on your machine to expedite the process.
Kenneth Bland
Rank: Sempai
Belt: First degree black
Fight name: Captain Hook
Signature knockout: right upper cut followed by left hook
Signature submission: Crucifix combined with leg triangle
Rank: Sempai
Belt: First degree black
Fight name: Captain Hook
Signature knockout: right upper cut followed by left hook
Signature submission: Crucifix combined with leg triangle
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
If you export from Director there is (a checkbox). This does not seem to have been brought into either of the tools you use. Perhaps you could lodge an enhancement request?
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.