We require some processing after a job has executed. Currently we are using server routines (BASIC) for this purpose. Is it possible to use parallel routines as Before/After Job routines:?:
We went through the documentation, and tried parallel routines in transformer, both as function and as "Before/After Stage" routine with the help of samples. We would like to use the same for "Before/After Job" processing.
Parallel Routine for Before/After Job Processing
Moderators: chulett, rschirm, roy
The "Before/After" subroutines for both server and PX jobs are the same, they are coded in the basic language. If you wish to use another programming language for these routines can can do that, but they still need to be called through a piece of BASIC code.
<a href=http://www.worldcommunitygrid.org/team/ ... TZ9H4CGVP1 target="WCGWin">
</a>
</a>
-
- Participant
- Posts: 3593
- Joined: Thu Jan 23, 2003 5:25 pm
- Location: Australia, Melbourne
- Contact:
You can also run your existing BASIC routines from sequence jobs. This can be more convenient then putting it in after-job as you get triggers for controlling when it gets run. I've got to admit I don't think I've ever chosen to use a before-job or after-job routine, I've always opted for doing it at the sequence job level.
Certus Solutions
Blog: Tooling Around in the InfoSphere
Twitter: @vmcburney
LinkedIn:Vincent McBurney LinkedIn
Blog: Tooling Around in the InfoSphere
Twitter: @vmcburney
LinkedIn:Vincent McBurney LinkedIn
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact: