Hi,
Is it posible to edit the Generated OSH.
coz iam facing a problem when i convert a decimal to string using a user defined routine incorporated, not all the columns geting changed with the metadate.
i.e., though i change the type manualli in the editior, it doesnt get reflected in output or further stage.
I could see this in the Generated OSH.
So i need to know the way to edit the OSH.
Thanx
Regards
kumar
How to edit Generated OSH
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
There's no good reason to edit the generated OSH. The correct solution is to get your job design right, so that it generates correct OSH.
Even if you did, recompiling the job will regenerate whatever OSH it will, rendering your editing efforts futile.
Even if you did, recompiling the job will regenerate whatever OSH it will, rendering your editing efforts futile.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Thanx ray,
My issue is, as i told, though i convert the datatype and lenght manually in stages, while i complie, it takes the data type and length of the earliar try.
So it keeps giving me error.
Is there any way we can refresh OSH so that it takes the current configuration of the job.
regards
kumar
My issue is, as i told, though i convert the datatype and lenght manually in stages, while i complie, it takes the data type and length of the earliar try.
So it keeps giving me error.
Is there any way we can refresh OSH so that it takes the current configuration of the job.
regards
kumar
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact: