Page 1 of 1

Checkpoints retention

Posted: Tue Dec 06, 2016 9:52 am
by antpetre
Hi everyone,

Does anybody know the job retention of datastage sequence jobs' checkpoints? I need to know for how long a sequence job is restartable from a checkpoint before resetting itself and if this retention period is configurable.

thank you very much!

Posted: Tue Dec 06, 2016 10:47 am
by chulett
Basically, they are retained until the job run completes or the job is reset. They never "reset themselves" so there's not really a retention period.