Schedulers
Posted: Thu Apr 21, 2011 11:47 am
hi,
Can anu one tell me the advantages and drawbacks of using datastage in built scheduling option in director rather than using Unix crontab or third party schedulers such as Autosys or TWS?
Thanks
Can anu one tell me the advantages and drawbacks of using datastage in built scheduling option in director rather than using Unix crontab or third party schedulers such as Autosys or TWS?
Thanks