Page 1 of 1

Shedule a job for different timings in a single day

Posted: Fri Dec 17, 2010 12:26 am
by harivasireddy
Hi All,

My requirement is, scheduling a job to run in different timings in a single day using datastage director.
As per my knowledge, we can shedule a job in a particular time in a single day using Director.

Can any one of you tell me the way to run a job in different timings in a single day.

Thanks in Advance.

Posted: Fri Dec 17, 2010 12:50 am
by jpraveen
Hi hari,

you can schedule the job in different timings in same day,

Add to schedule-> Daily->give specific time
and again
Add to schedule-> Daily->another timing

so that you can schedule many times to run the same job in a day

Posted: Fri Dec 17, 2010 4:27 am
by Sreenivasulu
Basically you can create multipe schedules for the same job . But you need to make it multi-instance to avoid a conflict .

Regards
Sreeni

Posted: Fri Dec 17, 2010 5:31 am
by harivasireddy
jpraveen wrote:Hi hari,

you can schedule the job in different timings in same day,

Add to schedule-> Daily->give specific time
and again
Add to schedule-> Daily->another timing

so that you can schedule many times to run the same job in a day
Thanks for your Immediate response.

And also Can you suggest me how can I run the same job in multiple times at the same time.

Posted: Fri Dec 17, 2010 5:35 am
by harivasireddy
Sreenivasulu wrote:Basically you can create multipe schedules for the same job . But you need to make it multi-instance to avoid a conflict .

Regards
Sreeni
Thanks for your respnose Srini.

But can you explain me, this multi instance concept in a detailed manner.
what is the advantage of this multi-instance and where I have to select.

Posted: Fri Dec 17, 2010 7:20 am
by chulett
It's documented, so suggest you start here: Multiple job invocations section in the Director Client Guide pdf.