Hi Team,
We are strugling with restartability of the sequences.
My job structure is like-
There is Master Sequence which is calling the nine sequences in parallel.
We have set like if all the inner sequence abort then only abort the Master sequence else continue triggering other inner sequence.
We have checked the option "Add check point so sequence is restartable on failure" in Master Sequence as well as in all the inner sequences.
Let suppose if Sequence 5 and Sequece 7 abort, we want when we trigger job next time after fixes it should triiger only sequence 5 and sequence 7.
But in our case Master job sequece is triggering all the jobs again.
Job design is like
Master Sequence -------> Inner Seuences
(Add check enabled) (9 inner sequeces running paralle)
( Add check point enable)
Please advice us on this.
Thanks in advance.
Regards,
Srai
Restartability of the sequences
Moderators: chulett, rschirm, roy
No need. Sequences must abort to restart properly and that includes your Master so make sure the master aborts whenever a child sequence aborts. You should be able to use "OK" triggers to accomplish that along with the "Automatically handle" compilation option, that or explicit use of the Terminator stage.
-craig
"You can never have too many knives" -- Logan Nine Fingers
"You can never have too many knives" -- Logan Nine Fingers