Page 1 of 1

Referenced Shared Container has been modified

Posted: Mon Sep 27, 2010 11:31 pm
by deepa_shenoy
Hi,

I have imported a job created in DataStage 7.5 to DataStage 8.1. This job has a number of Shared Containers.

I modified two of the Shared Containers and compiled the job. The job got compiled successfully, but when I try to run the job, from the designer, it says 'Referenced Shared Container has been modified'.

What could be the issue and how can this be resolved?

Thanks in advance.

-Deepa

Re: Referenced Shared Container has been modified

Posted: Wed Sep 29, 2010 2:37 am
by tennetiharika
deepa_shenoy wrote:Hi,

I have imported a job created in DataStage 7.5 to DataStage 8.1. This job has a number of Shared Containers.

I modified two of the Shared Containers and compiled the job. The job got compiled successfully, but when I try to run the job, from the designer, it says 'Referenced Shared Container has been modified'.

What could be the issue and how can this be resolved?

Thanks in advance.

-Deepa
call the changed shared container again and run the job.try it out , should work