error in address standardization

A forum for discussing DataStage<sup>®</sup> basics. If you're not sure where your question goes, start here.

Moderators: chulett, rschirm, roy

Post Reply
Sgiri1
Participant
Posts: 43
Joined: Sat Nov 08, 2008 10:58 pm
Location: Tambaram

error in address standardization

Post by Sgiri1 »

Hi we are using CASS stage and GAV in our parallel job for address standardization.

we are processing a dataset with 700,000 records with default apt configuration. our job aborts after 10K records of processing with the warnings below:

APT_CombinedOperatorController,0: ???(14070):Sun Dec 13 22:49:14 2009 ERROR: Error from mtEndMatch
APT_CombinedOperatorController,0: Invalid handle or maximum number of cases exceeded
APT_CombinedOperatorController,0: ???(14070):Sun Dec 13 22:49:14 2009 ERROR: Error from mtEndMatch
APT_CombinedOperatorController,0: Invalid handle or maximum number of cases exceedederror from ENDCASE
APT_CombinedOperatorController,0: ???(14070):Sun Dec 13 22:49:14 2009 ERROR: Error: from processSingleAddress
APT_CombinedOperatorController,0: ???(14070):Sun Dec 13 22:49:14 2009 ERROR: Error from mtEndMatch
APT_CombinedOperatorController,0: Invalid handle or maximum number of cases exceedederror from ENDCASE
APT_CombinedOperatorController,0: ???(14070):Sun Dec 13 22:49:14 2009 ERROR: vexit status=4
APT_CombinedOperatorController,0: ???(14070):Sun Dec 13 22:49:14 2009 ERROR: Notifying process group of termination
ray.wurlod
Participant
Posts: 54607
Joined: Wed Oct 23, 2002 10:52 pm
Location: Sydney, Australia
Contact:

Post by ray.wurlod »

Moderator: please move to QualityStage forum

Sgiri1, please disable operator combination, even if only temporarily, so that you can be confident about which stage is actually throwing the error.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Post Reply