Source changes not seen in ISM

A forum for discussing DataStage<sup>®</sup> basics. If you're not sure where your question goes, start here.

Moderators: chulett, rschirm, roy

Post Reply
danddmrs
Premium Member
Premium Member
Posts: 86
Joined: Fri Apr 20, 2007 12:55 pm

Source changes not seen in ISM

Post by danddmrs »

Our shop is attempting to implement a source control system for our DataStage elements using Subversion. We have added the eclipse plug-in to ISM and can access the DS repository, Send to SC workspace, and add jobs to the SVN repository.

When a job has been added to SVN the job has a suffix like 0 12/31/69 6:00 PM added to the view of the job in the DS repository view of ISM.

When a job that is in SVN is changed in DS Designer and saved that change can be seen in the ISM viewer (the jobname suffix remains unchanged). When the same job is changed again in Designer and saved the new changes cannot be seen in the ISM viewer. Additionally, the image of the job in Designer (when holding the mouse over the jobname) reflects only the first change.

What has to happen so that the current version of the job in the DS repository can be seen in ISM?
Post Reply