We are in the process of upgrading DS 8.1 to 9.1 and Oracle 10g to 11g exadata. After the upgrades, in 9.1, will the Oracle stages which used to read/write from Oracle 10g remain compatible with exadata ?
Will there be a need to do any code change or will DS take care of it internally ?
DS 8.1 to 9.1 upgrade and Oracle 10g to 11g Exadata upgrade
Moderators: chulett, rschirm, roy
-
- Premium Member
- Posts: 36
- Joined: Mon Mar 03, 2014 3:09 am
-
- Premium Member
- Posts: 9
- Joined: Sat Jul 14, 2007 10:47 am
Re: DS 8.1 to 9.1 upgrade and Oracle 10g to 11g Exadata upgr
Based on my experience during DS version upgrade from 8.1 to 8.5. We had to make some minor changes. Its always advised to test all the scenarios to make sure its working as expected.
I am not sure about 8.1 to 9.1.
I am not sure about 8.1 to 9.1.
8.1 is old enough that you will probably run into changes that affect your jobs, typically where code was tightened up. You may also find things that no longer work as you expect which typically means you've been relying on a bug that has since been fixed. As noted, an extensive test will be required to shake these out.
-craig
"You can never have too many knives" -- Logan Nine Fingers
"You can never have too many knives" -- Logan Nine Fingers