There is a batch which is scheduled to run everyday at 5pm.
We are currently running the batch on adhoc at 12pm and its 4pm. We want to unschedule the run for 5PM and continue the currently running instance so that it does not coincide with its scheduled run.
Please help.
how to unschedule a run of a job while it is running
Moderators: chulett, rschirm, roy
-
- Premium Member
- Posts: 17
- Joined: Wed Nov 30, 2011 1:16 am
-
- Premium Member
- Posts: 536
- Joined: Thu Oct 11, 2007 1:48 am
- Location: Bangalore
Where the batch is scheduled and which scheduling tool you are using?
Thanks
Prasoon
ETL Consultant
LinkedIn :- http://www.linkedin.com/profile/view?id ... ab_pro_top
Blog:- http://dsshar.blogspot.com/
Prasoon
ETL Consultant
LinkedIn :- http://www.linkedin.com/profile/view?id ... ab_pro_top
Blog:- http://dsshar.blogspot.com/
A little late but assuming the Director - just unschedule it. All you are doing is removing an entry from cron (or at) which will not affect anything currently running. If this is a "run every" schedule, you'll need to add it back when it's time to get back on schedule.
-craig
"You can never have too many knives" -- Logan Nine Fingers
"You can never have too many knives" -- Logan Nine Fingers