Data Stage Installation multiple versions

Post by Poovalingam »

Hi Everybody,
Can we have multiple data stage version get installed in a same server?
I'm not trying to do installation. I just thought of this point since I have come across with few data stage upgradation projects. I haven't seen anywhere using same server for 2 versions.

Regards,
Poovalingam.
BI-RMA
Premium Member
Premium Member
Posts: 463
Joined: Sun Nov 01, 2009 3:55 pm
Location: Hamburg

Post by BI-RMA »

Yes, this is possible. You have to make sure that two different installations do not share resources that they can't. Most of this is handled automatically during installation, but not all of it.

We installed 8.5 parallel to 8.0.1 for a migration-test once. No issues there.
"It is not the lucky ones are grateful.
There are the grateful those are happy." Francis Bacon
vmcburney
Participant
Posts: 3593
Joined: Thu Jan 23, 2003 5:25 pm
Location: Australia, Melbourne
Contact:

Post by vmcburney »

This has become the preferred approach for upgrading 8.x versions as it lets you use the Migration tool from the IBM migration concierge team. The migration tool moves content from 8.0.1, 8.1 or 8.5 and move it into 8.7 running on the same server.
Poovalingam
Participant
Posts: 111
Joined: Mon Nov 30, 2009 7:21 am
Location: Bangalore

Post by Poovalingam »

Thanks all. It's good to know that tools are preferred for migration. TA.

Regards,
Poovalingam.
nabeela
Participant
Posts: 3
Joined: Thu Feb 17, 2011 5:14 am
Location: MUMBAI

Is it possible to run two version of DS jobs simultaneously?

Post by nabeela »

vmcburney wrote:This has become the preferred approach for upgrading 8.x versions as it lets you use the Migration tool from the IBM migration concierge team. The migration tool moves content from 8.0.1, 8.1 or 8.5 and move it into 8.7 running on the same server.
There is situation where half of the jobs from a project need to be migrated & running into new version of DS and half of the jobs are still running in old version in production environment, that need to be migrated into new version in the second phase.
Here is question, can two version of DS jobs be run simultaneously from the same project? If yes, what are the things need to take care?

Any documentations/link will be great?
chulett
Charter Member
Charter Member
Posts: 43085
Joined: Tue Nov 12, 2002 4:34 pm
Location: Denver, CO

Post by chulett »

The short answer is no. Projects are specific to the installation / version of DataStage.
-craig

"You can never have too many knives" -- Logan Nine Fingers
nabeela
Participant
Posts: 3
Joined: Thu Feb 17, 2011 5:14 am
Location: MUMBAI

Post by nabeela »

Can we keep both the versions running simultaneously? Run some projects from old version and some from the new version on the same server?
ArndW
Participant
Posts: 16318
Joined: Tue Nov 16, 2004 9:08 am
Location: Germany
Contact:

Post by ArndW »

Yes, that will work - the same job can run simultaneously on one machine from two different projects; assuming that they don't use some single-threaded type resource such as writing to the same sequential file.