I have a Job sequence like this which calls multiple job sequences like this
Job sequence1-->Job sequence 2-->Job sequence3-->Parallel job1
Job sequence 3 has aborted with the error message "JobControl (fatal error from @ABORT_JOB_FAILED): Job Failed"
But when i look at the Parallel job1 , it is running.
Often, this job sequence fails similarly. But when i restart it , just runs fine.. Can there be a disconnect between the job sequence 2 and the parallel job 1?could that be a reason?
connection between job and sequencer
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 148
- Joined: Thu Apr 10, 2008 12:47 am
-
- Premium Member
- Posts: 1735
- Joined: Thu Mar 01, 2007 5:44 am
- Location: Troy, MI
What kind of trigger is between "Job sequence3" and "Parallel job1"? Your job failure has nothing to do with your Sequence, you need to check the appropriate log to see what is going on. And by "appropriate" I mean the log of the job that failed.