Hi All,
I would like to know what is the maximum number of workflows which can be given in a Parallel Job? Is there any limit?
Also, what is the maximum number of target tables we can load in a single job? Is there any limit?
Thanks in advance.
Regards,
Deepa
Maximum number of workflows which can be given in Parallel
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 95
- Joined: Thu Sep 24, 2009 12:15 am
- Location: India
Re: Maximum number of workflows which can be given in Parall
Answer:deepa_shenoy wrote:Hi All,
I would like to know what is the maximum number of workflows which can be given in a Parallel Job? Is there any limit?
Also, what is the maximum number of target tables we can load in a single job? Is there any limit?
Thanks in advance.
Regards,
Deepa
Looks like you are comparing with Informatica 'workflows'.
In DataStage prespect, it depends on the volume of the data you are processing not the number of target tables in a single job.
You need to decide the best design, which meets the requirement.
Go through the Best Practices which were given in Parallel Extender ( Advanced) user guide
-
- Participant
- Posts: 95
- Joined: Thu Sep 24, 2009 12:15 am
- Location: India
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact: