HI ALL,
I HAVE 4 SEQUENCES. I CAN'T RUN THE SEQUENCES SIMULTANEOUSLY THOUGH I HAVE GIVEN MULTIPLE-INSTANCES. I CAN RUN FROM JOB LEVEL
i.e., 1 sequence and a job belong to other sequence
The jobs are not related why it is happening so?
can any solve the situation.
thanks in advance
vj
SEQUENCE
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 7
- Joined: Wed Aug 09, 2006 4:24 am
Re: SEQUENCE
i am unable to run the 2nd sequence of jobs while the first sequence is running.vijaynaidu wrote:HI ALL,
I HAVE 4 SEQUENCES. I CAN'T RUN THE SEQUENCES SIMULTANEOUSLY THOUGH I HAVE GIVEN MULTIPLE-INSTANCES. I CAN RUN FROM JOB LEVEL
i.e., 1 sequence and a job belong to other sequence
The jobs are not related why it is happening so?
can any solve the situation.
thanks in advance
vj
-
- Participant
- Posts: 7
- Joined: Wed Aug 09, 2006 4:24 am
Re: SEQUENCE
i am unable to run the 2nd sequence of jobs while the first sequence is running. It doesn't give any message.vijaynaidu wrote:HI ALL,
I HAVE 4 SEQUENCES. I CAN'T RUN THE SEQUENCES SIMULTANEOUSLY THOUGH I HAVE GIVEN MULTIPLE-INSTANCES. I CAN RUN FROM JOB LEVEL
i.e., 1 sequence and a job belong to other sequence
The jobs are not related why it is happening so?
can any solve the situation.
thanks in advance
vj
The 2nd seq will be in running state and the jobs won't run untill the first sequence get completed.