Multiple Job Control
Multiple Job Control
This is a topic for an orphaned message.
We use nested job control jobs for our daily runs. One stream actually goes about 9 levels deep. With concurrent runs we can have quite a busy display going on in the Director.
One thing weve not had time to do is develop a slick array model like David mentioned. So Dave (hint, hint), if you wish to share some code or outlines of how youre doing fancy job control, my email address is bvincent@dmc.org.
Thanks.
Brad Vincent
Compuware Corporation
c/o The Detroit Medical Center
Data Warehousing with a "health"-y spin
(313) 966-2176
One thing weve not had time to do is develop a slick array model like David mentioned. So Dave (hint, hint), if you wish to share some code or outlines of how youre doing fancy job control, my email address is bvincent@dmc.org.
Thanks.
Brad Vincent
Compuware Corporation
c/o The Detroit Medical Center
Data Warehousing with a "health"-y spin
(313) 966-2176