Page 1 of 1

Regarding Sequencer job

Posted: Thu Mar 02, 2006 11:03 am
by urs_ravindra
when i run the controljob of sequencer,it finished with 1 warning.

The only job aborted is running fine when i ran it separately.

what should be the reason?

Posted: Thu Mar 02, 2006 11:09 am
by venugopal81
what is the error that you find when the job is aborted..

Posted: Thu Mar 02, 2006 11:51 am
by ray.wurlod
Look at the aborted job's "started" message in the log to determine with what parameter values it was started. Are these the same as for a manual run? Under what identity do DataStage jobs run? Do they have the same id (and therefore the same permissions) as for manual runs?