Migration ds proj from 6.0 to 7.5
Posted: Fri Dec 09, 2005 7:07 am
Hi,
I am migrating the proj from 6.0 to 7.5.1, while testing one job is failed. but that is running fine in 6.0. The err its giving is
Abnormal Termination
I am loading the data to Oracle db (using OCI stage).
plz revert a mail asap.
thanks
rk
I am migrating the proj from 6.0 to 7.5.1, while testing one job is failed. but that is running fine in 6.0. The err its giving is
Abnormal Termination
I am loading the data to Oracle db (using OCI stage).
plz revert a mail asap.
thanks
rk