HI
For a perticular job in job sequence warning limit is set in following manner.

1In director .
Job run requested
Mode (row/warn limits) = 0/0
Job Parameters --->

2.Run job options limit page is set to abort job after 50(default) warnings.

when i run this job through sheduler it runs with 140 warnings and job is not aborted.
Can any one tell me which one it will consider when runnng job,

thks
ArndW
Participant
Posts: 16318
Joined: Tue Nov 16, 2004 9:08 am
Location: Germany
Contact:

Post by ArndW »

The value for number of warnings you specify in the scheduler overrides the default value set in the job; so if you wish the job to abort after a given number of warnings you need to change the value of 0 you have set in the schedule.