Resetting KeyMgmt Value
Posted: Thu Sep 15, 2005 8:59 am
Hi
I have been able to reset the value using the "ExecuteTCl" at the Before Stage Subroutine.
However while trying the EXECUTE command using BASIC code in the Job Control i havent been able to achieve the same.
Do i have to Open the SDKSequence file before issuing an EXECUTE command to peform the UPDATE
Any ex. code snippets?
Thanks in advance
I have been able to reset the value using the "ExecuteTCl" at the Before Stage Subroutine.
However while trying the EXECUTE command using BASIC code in the Job Control i havent been able to achieve the same.
Do i have to Open the SDKSequence file before issuing an EXECUTE command to peform the UPDATE
Any ex. code snippets?
Thanks in advance