Page 1 of 1

Abnormal termination of stage

Posted: Mon Aug 01, 2005 11:36 am
by shivan
hi,
i m getting this error when i run the job. I think it is due to lack of memory or the server is very slow because the job runs ok in the evening. But while running at day time. It gives this error.
As i am new to datastage. I want to confirm that that i m correct or not

thanks
shivan

Posted: Mon Aug 01, 2005 11:39 am
by Sainath.Srinivasan
Abnormal termination can be due to several reasons and memory problem is one of it.

Try resetting the job for more info.

Posted: Mon Aug 01, 2005 11:43 am
by shivan
hi,
how i can reset the job for more info.

thanks
shivan
Sainath.Srinivasan wrote:Abnormal termination can be due to several reasons and memory problem is one of it.

Try resetting the job for more info.

Posted: Mon Aug 01, 2005 11:46 am
by Sainath.Srinivasan
With no disrespect, these are covered in the basic steps of the DataStage class and tutorial. So I will suggest you to go through them first.

PS: Reset is done via Director.