Can we use multiple Merge stages in 1 job
Posted: Mon May 16, 2005 2:34 pm
Hi,
I have one source file which needs to be merged with 8 files seperately. Can I use all of them in one job, or will there be a issue.
What I wnat to do is :
Merge1(Srcfile+ref1)--Tx--Target1
Merge2(Srcfile+ref2)--Tx--Target2
.
.
.
Merge8(Srcfile+ref8)--Tx--Target8
As all my Merge stages use the same source file, will it hang or will it be ok to use it as I have different targets ?.
Thanks,
I have one source file which needs to be merged with 8 files seperately. Can I use all of them in one job, or will there be a issue.
What I wnat to do is :
Merge1(Srcfile+ref1)--Tx--Target1
Merge2(Srcfile+ref2)--Tx--Target2
.
.
.
Merge8(Srcfile+ref8)--Tx--Target8
As all my Merge stages use the same source file, will it hang or will it be ok to use it as I have different targets ?.
Thanks,