DS Upgrade Issue
Posted: Wed May 11, 2005 2:38 pm
Recently we upgraded from V6.0.1 to V7.5. In my project there are 70 jobs which have sucessfully run except for one job which is no different from the others!
This job extracts data from SAP R/3 using ABAP Extract stage and writes to a flat file. When I run the job it gives:
1)Warning : Unknown: DSCGetStrLinkProp Value(??????) of property (CONNECTION_NAME) contains unmappable characters (ISO8859-1)
2)Then aborts with the following error: "Error while retrieving link property DSSAP Logical Connection not found: ??????"
Have checked Ascential knowledge base, they have similar issue there but have no workaround or solution yet.
Did any one deal with this before?
I did build a new job like this job and it works, the issue should be resolved as the job is in production and can not import this new job to production.
Thanks
Vinay
This job extracts data from SAP R/3 using ABAP Extract stage and writes to a flat file. When I run the job it gives:
1)Warning : Unknown: DSCGetStrLinkProp Value(??????) of property (CONNECTION_NAME) contains unmappable characters (ISO8859-1)
2)Then aborts with the following error: "Error while retrieving link property DSSAP Logical Connection not found: ??????"
Have checked Ascential knowledge base, they have similar issue there but have no workaround or solution yet.
Did any one deal with this before?
I did build a new job like this job and it works, the issue should be resolved as the job is in production and can not import this new job to production.
Thanks
Vinay