Difference between Xformer processing in DS6.0 and 7.0
Posted: Tue Jan 11, 2005 3:52 am
We have some jobs which were running on DS 6.0 and Informix which we are migrating to 7.0 and TerraData. All the jobs are server jobs. But we are facing issues as record counts do not match between 6.0 and 7.0 jobs. We have fixed the TD-Informix issues. Still problems persist. Is there any difference in processing between 6.0 and 7.0? For e.g, we observed that records dropped as nulls were there in some fields in constraints in 6.0 are not dropped in 7.0 till the constraint is processed. Are there any more such changes?