Is Copying of stages from one job to other job not possible in DS 7.0.
When i tried this, it was not possible. But i tried to copy in the same job it happened.
In DS 7.1, this was possible , but in DS 7.0, it was not possible.
Is it possible in DS 7.0
Copying of stages from one job to other job
Moderators: chulett, rschirm, roy
Yes, it is possible. One of the very nice things they finally added in the 7.x versions was copy and paste, which means you can copy a stage in one job and paste it into another. I'm running 7.0.1 right now and do it all the time.
The other ong-awaited big winner was allowing 'dangling links'. :D
The other ong-awaited big winner was allowing 'dangling links'. :D
-craig
"You can never have too many knives" -- Logan Nine Fingers
"You can never have too many knives" -- Logan Nine Fingers
-
- Participant
- Posts: 3593
- Joined: Thu Jan 23, 2003 5:25 pm
- Location: Australia, Melbourne
- Contact:
Are you attempting to copy stages between jobs in seperate Designer sessions? You can only copy stages inside the one Designer. This should work in version 7.0.
Certus Solutions
Blog: Tooling Around in the InfoSphere
Twitter: @vmcburney
LinkedIn:Vincent McBurney LinkedIn
Blog: Tooling Around in the InfoSphere
Twitter: @vmcburney
LinkedIn:Vincent McBurney LinkedIn
Thanks for your replies, but i should say sorry because ,i tried to copy a routine activity of a sequencer job into a server job. This is the mistake i did. So, i did'nt get copied. Immediately without checking the jobs , i posted this
Otherwise, we can copy between two DS sessions also, if the jobs are of same type.
Thanks once again.
![Confused :?](./images/smilies/icon_confused.gif)
Otherwise, we can copy between two DS sessions also, if the jobs are of same type.
Thanks once again.
Aim high