DataStage Sequencer Job

Post questions here relative to DataStage Server Edition for such areas as Server job design, DS Basic, Routines, Job Sequences, etc.

Moderators: chulett, rschirm, roy

Post Reply
ketfos
Participant
Posts: 562
Joined: Mon May 03, 2004 8:58 pm
Location: san francisco
Contact:

DataStage Sequencer Job

Post by ketfos »

Hi,
Can you call a datastage sequencer job from a Batch job?

Ketfos
kcbland
Participant
Posts: 5208
Joined: Wed Jan 15, 2003 8:56 am
Location: Lutz, FL
Contact:

Post by kcbland »

Yes. The API's documented in your DS manual are the same ones used by Batch and Sequencer jobs. There is no difference between any job types (Batch, Server, Parallel, Sequencer, etc) when it comes to running them.
Kenneth Bland

Rank: Sempai
Belt: First degree black
Fight name: Captain Hook
Signature knockout: right upper cut followed by left hook
Signature submission: Crucifix combined with leg triangle
ketfos
Participant
Posts: 562
Joined: Mon May 03, 2004 8:58 pm
Location: san francisco
Contact:

Post by ketfos »

Hi,

Then how do you add a sequencer job in Job Control (Under Properties) in Add Job list box.?


Ketfos
kcbland
Participant
Posts: 5208
Joined: Wed Jan 15, 2003 8:56 am
Location: Lutz, FL
Contact:

Post by kcbland »

Type it in, or add another job and replace the name and parameters with the appropriate information. Not necessarily clean, but it does work.
Kenneth Bland

Rank: Sempai
Belt: First degree black
Fight name: Captain Hook
Signature knockout: right upper cut followed by left hook
Signature submission: Crucifix combined with leg triangle
ailuro
Participant
Posts: 21
Joined: Wed Sep 10, 2003 11:09 pm
Location: GMT+8

Post by ailuro »

Then how do you add a sequencer job in Job Control (Under Properties) in Add Job list box.?

They're already there. It's just that the list box items are grouped and sequences appear after the jobs.
คาร์โล ตัน
Post Reply