Control Job problem
Posted: Fri May 28, 2004 1:43 pm
In "Jobs" I have a "Control job" category and in that I have a job(LoadSetScheduler) which has a main entry point logic to our Ascential project.
So when I am making modification in "job control" for some reason the modified code is not picked when we run the project.
I am not sure why the modified code is not picked up. Do I have to compile the code or do some thing else.
-Thanks
So when I am making modification in "job control" for some reason the modified code is not picked when we run the project.
I am not sure why the modified code is not picked up. Do I have to compile the code or do some thing else.
-Thanks