Hi
When i am running a job which has 4 lookups and a driver file with 30 million records and 5 output files and each of these files are directed to seperated directories then why while running the job, When i looked into project directory this file is increasing in Megabytes as processing for job is going on.... &PH&/DSD_StageRun1392 .... my worry is our project directory is only 7 GB and if i calculate for this single job its taking up upto 4GB when the job is finished. I have checked for all paths and i don't see any wrong with them(nothing is default) so what could be the reason for this and my job is processing at 42 rows/sec which i believe will take around 20 hrs to process allthe records.
Thanks
Mark
When i am running a job which has 4 lookups and a driver file with 30 million records and 5 output files and each of these files are directed to seperated directories then why while running the job, When i looked into project directory this file is increasing in Megabytes as processing for job is going on.... &PH&/DSD_StageRun1392 .... my worry is our project directory is only 7 GB and if i calculate for this single job its taking up upto 4GB when the job is finished. I have checked for all paths and i don't see any wrong with them(nothing is default) so what could be the reason for this and my job is processing at 42 rows/sec which i believe will take around 20 hrs to process allthe records.
Thanks
Mark