Abnormal termination of Link_Collector_64 detected in DS 8.5
Posted: Wed Jun 05, 2013 1:15 pm
Hello,
We are in the process of converting Datastage 7.5 server jobs to Datastage 8.5 server jobs. All jobs were running in production for quite a while and no aborts. Now I have seen a few times the jobs failed at Link Collector, the message like:
Abnormal termination of stage SERVER_JOB_NAME..Link_Collector_64 detected
and also other messages along with this aborts is something like:
SERVER_JOB_NAME..Link_Collector_64.DSLink49: ds_ipcput() - timeout waiting for mutex
I believe the main problem is from the Link Collector. I have quite some jobs that used Link Collector, and some of them were ok and some of them failed with similar error.
Has anyone encountered similar issue? What's the solution? Can anyone share some wisdom on how to resolve the issues?
Thanks!
Haiquan Dai
We are in the process of converting Datastage 7.5 server jobs to Datastage 8.5 server jobs. All jobs were running in production for quite a while and no aborts. Now I have seen a few times the jobs failed at Link Collector, the message like:
Abnormal termination of stage SERVER_JOB_NAME..Link_Collector_64 detected
and also other messages along with this aborts is something like:
SERVER_JOB_NAME..Link_Collector_64.DSLink49: ds_ipcput() - timeout waiting for mutex
I believe the main problem is from the Link Collector. I have quite some jobs that used Link Collector, and some of them were ok and some of them failed with similar error.
Has anyone encountered similar issue? What's the solution? Can anyone share some wisdom on how to resolve the issues?
Thanks!
Haiquan Dai