scheduling details
Posted: Thu Feb 25, 2010 11:24 pm
Hi,
Is there a way to get the job names and their scheduling details for an entire project??
The jobs are scheduled to run from the datastage director itself.
Thanks,
Sharad
Is there a way to get the job names and their scheduling details for an entire project??
The jobs are scheduled to run from the datastage director itself.
Thanks,
Sharad