Hi
I have designed a sequence with a server job and a routine. The routine gets me the link counts from the server job using DSGetLinkInfo().
When I manually run the server job and then the routine, the latter runs fine and reports the counts correctly. But when I run them through the sequence, the routine cannot pick up the counts and reports 0.
After this if I run the isolated routine, it again gives me 0. But when I open the job and use "Show Performance Statistics" and then run the routine, it runs fine.
Just to add : My job monitor is running fine.
Please advise on this issue
Thanks
Link Count Issue
Moderators: chulett, rschirm, roy
-
- Participant
- Posts: 3337
- Joined: Mon Jan 17, 2005 4:49 am
- Location: United Kingdom
-
- Participant
- Posts: 80
- Joined: Fri Aug 21, 2009 7:49 am
- Location: India
Link Count Issue
hi,
we are also facing similar kind of issue in parallel while trying to get the link count using a after job sub-routine. we have given the job name,stagename,linkname as the parameter to the sub-routine and tried to get the count of records passed through that link. We are getting the count properly for most of the jobs. But for some of the jobs it is showing the non-zero value through 'show performance statistics'. But the routine is getting value as 0. when we run it next time without making any changes to the code it is working properly.![Confused :?](./images/smilies/icon_confused.gif)
we are also facing similar kind of issue in parallel while trying to get the link count using a after job sub-routine. we have given the job name,stagename,linkname as the parameter to the sub-routine and tried to get the count of records passed through that link. We are getting the count properly for most of the jobs. But for some of the jobs it is showing the non-zero value through 'show performance statistics'. But the routine is getting value as 0. when we run it next time without making any changes to the code it is working properly.
![Confused :?](./images/smilies/icon_confused.gif)