Hi,
I have DS 7.5 running on windows. I have some sequencer jobs scheduled to run everyday and they were failing to get triggered. Can you help me to figure out as why scheduling doesn't work....The same was working for the past 2 years and it stopped working for the couple of days.But when i start the job manually it works....Can any one please help me with this.
Thanks in Advance
Kamesh
Datastage Scheduling does not work
Moderators: chulett, rschirm, roy
a) what has changed between the time when it worked and when it stopped working?
b) what is displayed on your DataStage server in a CMD window when logged in with the userid that you use in DataStage, you enter the command "at"?
b) what is displayed on your DataStage server in a CMD window when logged in with the userid that you use in DataStage, you enter the command "at"?
<a href=http://www.worldcommunitygrid.org/team/ ... TZ9H4CGVP1 target="WCGWin">
</a>
</a>
I assume that the AT schedule is gone. Re-enter your scheduling from DataStage (actually, do the old schedules still show in the director?).
Did you enter the "AT" command from a shell to see what entries are present?
Did you enter the "AT" command from a shell to see what entries are present?
<a href=http://www.worldcommunitygrid.org/team/ ... TZ9H4CGVP1 target="WCGWin">
</a>
</a>
Got the issue
I got the issue.
Actually a file called vmdsr_sched.exe is missing in the path where the windows scheduler looks for.This may be due to some patch updates of any application in the system. So i had to replace the exe file in the path required, by copying the exe file from my development environment machine