Page 1 of 1

Job Aborted after 50 errors logged topic

Posted: Tue Jun 10, 2008 12:51 am
by snassimr
Hi , everybody !!!

I get some strange DS behaviour .

I run some job with Job Sequence . After 50 warnings the job aborted due 50 warnings limit and I see in Job Sequence log the following row : "Mode (row/warn limits) = 0/50".
But where the limit was set . I dont know the way to set this limit from Job Sequence. So from where it has come and how to remove the limit . I can allow the job running after 50 warnings.

If anybody know the way to set limits from job sequence ?
How to remove tthe limit in my case ?

Thanks,Nissim

Posted: Tue Jun 10, 2008 1:03 am
by ray.wurlod
In the Job Run Options dialog, set Limits on the Limits tab.
In Director, change the defaults via Tools > Options, which a Search would have discovered.

Even better, design jobs that don't generate warnings in the first place.